Architectural Build
Sensational Omeo
Here’s a luxury home that has more ticks than there are boxes for them. At 370sqm and with five bedrooms, six bathrooms, four-car garaging, a gym and a lift, you’d be hard-pressed to find anything else you’d ever need, now or in the near future.
This three-level beauty also has a fully automated solar-panel system with battery retention, a solar hot-water setup, and stormwater retention pods that store and reuse rain water. Thermally broken joinery and wool-blend insulation keep this large house cosy.
And did we mention the view? The living areas and decks take in great sweeps of sea and city from their grandstand position on the hill. The view is pretty good from the road too. With schist, steel and plaster cladding, the house is attractive on its hillside site.
Inside, the spaces are light and airy – as you’d expect from a house with so many windows that invite the views in, and glass doors that encourage the owners to step outside to enjoy them. The kitchen and bathrooms are perfection in gleaming white.
Watch and listen to Tom as he walks and talks us through this incredible project and he details many of the unique features on this property.
Omeo Building Progress Video Series
We follow the build progress of our biggest build project for 2019 – 2020! A stunning architectural home built on Redcliffs Hill in Christchurch! this stunning new build occupies 3 levels overlooking Christchurch city and the Southern Alps.
You can also view our Project Omeo video series, completion photos and also some build progress images below.
Ep 1. Foundations & Blockwork 2019Â
In this video, we give you our first update on Project Omeo. This is the very beginning of what has turned out to be an incredible and very satisfying build.
Ep 2. Frames Arrive
Les O’Connell fronts the camera today and gives us an update on project Omeo.
Ep 3. Framing Up
With each floor consuming approximately 3 truckloads of timber we have now completed all the floors and have the roof rafters nearly finished ready for the roofing membrane!
Ep 4. Taking Shape! Jan 2020
Tom gives us the January update and explains the progress on the construction which is now being prepped for being weather tight.
Ep 5. Windows & Joinery
The bathrooms are now waterproofed and ready for tiling, the exterior is now ready for cladding and all of the windows and joinery have been installed.
Ep 6. Clients – Leo & Priscilla
Hear from our wonderful clients as we approach the halfway mark on this amazing architectural build.
Ep 7. Finishing Stages
Project Omeo is getting really close to handover! Here’s a little update before we return for our final instalment of filming and take a more in-depth look on this complex architectural build.
Ep 8. Completion – Dec 2020
No expenses have been spared in this incredible home and the attention to detail is second to none! Tom walks us through this amazing build and explains some of the great features and craftmanship.
Gallery
Building Progress
Ready to get your build project started?
We pride our work and we treat each build like it’s our own